In the heart of the Meyrin logistics area in Geneva, Industrial and logistics building of approximately 19,000 m2 offering a rental area of 5,000 m2 and which will offer diversified accessibility to your employees and your customers.
This building looks like this:
It is quite possible to modulate according to needs and activities. This is designed to meet Minergie standards. It will present a high level of security (minimum level 3). The floor load is 0.5 to 2.5 tons.
Many parking spaces will be available around the building and in the basement Q3/2021 - Submission of the permit Q3/2022 - Start of construction Q2/2024 - Delivery of the building Plans available.
This building looks like this:
- Ground floor of approx. 4,400 m2, ideal for cross docking: - Usable height of 7 m. - Possible full level access. - 13 unloading docks - Floor load 2.5 T - 4 lifts of 4 tons - 2 elevators of 1800 kg
- 1st and 2nd level of approx. 4,700 m2 each: - Usable height of 4.90 m - Racking height 4 m - Floor load 1.5 T Attic of approx. 4,500 m2 of administrative area and workshop, divisible from 500 m2: - Usable height of 3m - Floor load 1.5 T - Beautiful glazed surface, convertible at the option of the lessee.
It is quite possible to modulate according to needs and activities. This is designed to meet Minergie standards. It will present a high level of security (minimum level 3). The floor load is 0.5 to 2.5 tons.
Many parking spaces will be available around the building and in the basement Q3/2021 - Submission of the permit Q3/2022 - Start of construction Q2/2024 - Delivery of the building Plans available.