WORK HAS STARTED, ONLY 2 APARTMENTS AVAILABLE
Your apartment in the heart of the village of Pomy
The building will include 6 apartments of 4.5 rooms, distributed over 3 levels and served by an elevator.
4.5 room apartment (LOT A6) on the 2nd floor, South-East orientation including:
- Entrance hall with built-in wardrobe
- 10m2 kitchen open to living room
- Living room of 33m2
- A 14m2 bedroom with bathroom
- A bedroom of 11.6m2
- A bedroom of 10.4m2
- A bathroom of 5.4m2
- A 6.5m2 balcony
- A 3.6m2 balcony
- A 53.5m2 attic accessible via a hatch
A cellar and a space for a private washer-dryer column in the laundry room complete this property.
A parking space in the basement as well as two outdoor spaces in addition to the price (Price of 3 spaces: CHF 65,000.-).
Traditional village architecture, careful construction, heating by ground distribution heat pump, photovoltaic panels are the technologies used for this construction.
The finishes of the apartment will be done at the discretion of the lessee.
Transfer duties are considerably reduced because they are calculated on the land share!
Delivery: around autumn 2025
Don't hesitate, take the plunge and request the complete file
Your apartment in the heart of the village of Pomy
The building will include 6 apartments of 4.5 rooms, distributed over 3 levels and served by an elevator.
4.5 room apartment (LOT A6) on the 2nd floor, South-East orientation including:
- Entrance hall with built-in wardrobe
- 10m2 kitchen open to living room
- Living room of 33m2
- A 14m2 bedroom with bathroom
- A bedroom of 11.6m2
- A bedroom of 10.4m2
- A bathroom of 5.4m2
- A 6.5m2 balcony
- A 3.6m2 balcony
- A 53.5m2 attic accessible via a hatch
A cellar and a space for a private washer-dryer column in the laundry room complete this property.
A parking space in the basement as well as two outdoor spaces in addition to the price (Price of 3 spaces: CHF 65,000.-).
Traditional village architecture, careful construction, heating by ground distribution heat pump, photovoltaic panels are the technologies used for this construction.
The finishes of the apartment will be done at the discretion of the lessee.
Transfer duties are considerably reduced because they are calculated on the land share!
Delivery: around autumn 2025
Don't hesitate, take the plunge and request the complete file