Apartment 4.5 rooms

CHF 669'000.-

1950 Sion
111 m² • 4.5 rooms
Your mortgage from: CHF <span class="sh-amount"></span>
Evolution of mortgage rates

Greenparc phase II: Eco-district in Sion

Construction in progress for Phase I
Phase I: Last opportunities!
Don't miss the last lots available for Phase I.

Delivery scheduled for the end of the first half of 2025 for buildings B, E, F, G and H (Phase I)

For the more patient:
Phase II currently in pre-sales: CDIJ buildings

Choose your future accommodation now, the possibilities for modifications, the best orientations and positions are still available, for now!
Available typologies: 1.5p / 2.5p / 3.5p / 4.5p

Complete interactive list of lots on www.berra-immobilier.ch

GENERAL CHARACTERISTICS:
- a real eco-district on the edge of the city of Sion which includes large green spaces designed in harmony with the landscape, an island of freshness just a stone's throw from all amenities
- special areas are provided: relaxation (spa, massage room, sauna), sports (fitness room with changing rooms-showers), meeting room, games room. Outside: playground, pétanque track, walking areas
- vegetable gardens are also available for green fingers
- commercial premises are offered
- the buildings are ideally distributed and leave space to breathe, no impression of a large, stifling PPE!
- in order to provide maximum privacy and calm to the residents, the back of buildings A and B will act as a noise and visual shield. They will completely isolate our beautiful subdivision, as will a green hill with trees in their extension
- a giant underground car park is planned to avoid any inconvenience to future owners, only a few visitor spaces remain nearby, priority given to well-being, soft mobility and greenery
- very practical moloks are provided at the entrance to the subdivision
- parcel boxes

ENERGY CHARACTERISTICS:
- one watchword: efficiency!
- photovoltaic solar panels on all the roofs of the 8 buildings
- remote heating, low temperature floor heating
- double flow ventilation with filtration and heat recovery
- pre-installation for connection of terminals for electric cars

DETAILED FEATURES
- to be discovered via file on request

Distribution of spaces, complete list of available lots and plans via file on request. For more information, we are at your disposal.

***ALL OUR PROPERTIES FOR SALE ON WWW.BERRA-IMMOBILIER.CH***

Further information

Floor 3
111 m² (usable areas)
Available on request
Reference 1322815

Equipment

Garage
New building

Calculate your financing for this property

This property is proposed by

Berra Immobilier SA
Pré-de-Foire 26
1920 Martigny